电力 · 磅清扬 · 4048
Prime Road 国家太阳能园区(ADB 52287)
电网位置
规模40 公里
总投资—
工期—批准 → 关账
出资方—
原文(4)
“Kampong Chhnang Province”52287-001-ipsa-en.txt · 第 4 页
“. 1 to the EDC susbation within the NSP, EDC substation, and 230 kV transmission lines (40 km) in length from the EDC substation to the Grid 6 (GS6) substation (existing facility) in Phnom Penh”52287-001-iee-en_0.txt · 第 14 页
“V transmission lines (40 km) in length from the EDC substation to the Grid 6 (GS6) substation (existing facility) in Phnom Penh”52287-001-iee-en_0.txt · 第 14 页
“. Overall Rating Satisfactory ADB = Asian Development Bank; CESMP = construction environmental and social management plans; CFPS II = Canadian Climate Fund for the Private Sector in Asia II; CSR = corporate social responsibility; ESHS = env…”52287-001-xarr-en.txt · 第 24 页
其他信息:项目编号 4048