Affected households (51 km section)reduced from 198 to 192 · 2011 · Appendix 4 para 3
192 household
0 百万美元
[40914] Maximum load of the project1 行 · 小计 0 百万美元
项目(原文)
数量
金额
Maximum load of the project23-80 MW equivalent capacity at 50% plant load factor (RRP) · 2011 · para 18
80 MW
0 百万美元
在同类电力项目中的位置
总投资
本项目 32
25.44中间值 4061.2
百万美元 · 灰点为同类项目,色带为常见范围
原文(7)
出资方Asian Development Bank
“osed Loan A loan of up to $8 million from the Asian Development Bank’s
(ADB’s) ordinary capital resources, with interest determined”
· 第 5 页地点Banteay Meanchey
“(CPTL) for the construction of a 221 kilometer (km), 115 kilovolt (kV) power transmission line in Cambodia to deliver power to Banteay Meanchey, Siem Reap, and Battambang provinces”
40914-01-cam-xarr.txt · 第 6 页电压等级115 kV
“. (CPTL) for the construction of a 221 kilometer (km), 115 kilovolt (kV) power transmission line in Cambodia to deliver power to Banteay Meanchey, Siem Reap, and Battambang provinces”
40914-01-cam-xarr.txt · 第 6 页线路长度221 km
“. The project consists of a 221 km 115 kV transmission line which imports least- cost electric power from Thailand to a switching yard located some 12 km north of the Thailand and Cambodia border town of Poipet, in Cambodia”
40914-cam-rp.txt · 第 8 页变电容量150 MVA
“t 150 megavolt-amperes, which is roughly equivalent to 127.5 MW”
40914-cam-rrp.txt · 第 13 页批准2006
“s approved on 9 February 2006”
40914-cam-rrp.txt · 第 13 页生效2005
“e parties under the PTA became effective on 26 October 2005”