| [40914] Trees affected (revised inventory, 51 km section) | 工程子项 | |
| [40914] Warehouse | 工程子项 | |
| [40914] Working capital | 工程子项 | |
| [42361] Banteay Meanchey 22 千伏 | 工程子项 | |
| [42361] Kampong Cham 22 千伏 | 工程子项 | |
| [42361] Kampong Thom 22 千伏 | 工程子项 | |
| [42361] Kandal 22 千伏 | 工程子项 | |
| [42361] Siem Reap 22 千伏 | 工程子项 | |
| [50248] 22 kV transmission line to Chrak Mtes substation | 工程子项 | |
| [50248] Actual energy generated from COD to December 2019 | 工程子项 | |
| [50248] Actual energy generated in calendar year 2018 | 工程子项 | |
| [50248] Area required for the PV modules | 工程子项 | |
| [50248] Design annual energy generation (P90) | 工程子项 | |
| [50248] Installed capacity (AC) | 工程子项 | |
| [50248] On-site retention pond | 工程子项 | |