关键事实

PWR.TL.115.OH.TOWER_SUPPLY23,190 sets
PWR.TL.115.OH.CONDUCTOR_SUPPLY2,873 km
PWR.TL.115.OH.OPGW_SUPPLY234 sets
PWR.TL.115.OH.INSULATOR_SUPPLY4,536 LS
PWR.TL.115.OH.MATERIAL3,157 LS
PWR.TL.115.OH.STRINGING2,250 km